Build 360
Example output

A real Build 360 budget

This is what you get from a plan set — a complete itemized budget by cost code, a material takeoff, and a price per square foot. Example below is a 2,400 sq ft standard-finish new home near Greenville, SC.

Sample Residence
New Residential · SC, Greenville · 2,400 heated SF + 480 SF garage
Excel PDF
Grand total
$426,387
$ / heated SF
$178
$ / total SF
$148
Direct cost
$355,500

Budget by cost code

1000Preparation & Preliminaries$19,200
2000Excavation & Foundation$34,500
3000Rough Structure$71,000
4000Roofing & Exterior Enclosure$46,500
5000Mechanical Systems$52,000
6000Interior Finishes$83,500
7000Specialties & Final$18,300
8000Landscaping & Site Improvements$30,500
Direct cost$355,500
Contingency (5%)$17,775
Builder fee (12%)$42,660
Sales tax (material)$10,452
Grand total$426,387

Sample line items — with Low · Expected · High

Code / itemQtyLowExpectedHighLine total
3010 Framing Lumber & Materials2,400 SF$8.30$10.50$13.75$25,200
3020 Framing Labor2,400 SF$4.80$8.50$9.35$20,400
3030 Roof Trusses2,400 SF$3.90$5.50$6.05$13,200
6020 Drywall8,200 SF$1.72$2.10$2.32$17,220
6050 Cabinets48 LF$172$210$309$10,080

Material takeoff (sample)

Framing lumber~14,800 board ft
Roof shingles26 squares
Drywall (1/2")256 sheets
Concrete (footings + slab)92 cu yd
Windows16 units
Interior doors12 units

Illustrative example for demonstration. Your budget is generated from your own plans and priced to your ZIP — actual figures vary by design, finish level, and region.

Get this for your plans

$19 per plan · any size · no subscription · 100% money-back guarantee — if you’re not satisfied, you don’t pay.